Last month's pass over a non-ferrous yard in the river district showed something we don't see on that site often: material stacked flush against the perimeter fence on three sides, with no aisle left between the pile and the property line. The permit for that yard sets a setback from the fence and a rough ceiling on outdoor storage volume. On the image, both looked blown through.
The first question wasn't "is this a violation." It was "when did this happen." A yard that size doesn't fill up overnight, but it can get close in a week if a buyer takes a load that was supposed to move and the seller pushes a backlog outside instead of turning away trucks. We've seen that exact pattern before: a processing line goes down, inbound material keeps arriving, and the overflow goes wherever there's room, fence line included.
So before writing anything up, we pulled the prior three months of passes on that parcel. Two of them showed the yard sitting well inside its footprint, stock rows with clear separation from the fence and from each other. The third, from early in the quarter, showed a smaller version of the same crowding, material creeping toward the boundary but not touching it. That run showed a yard trending toward its limit for two cycles running, with the latest pass landing on the week it finally tipped over.
That's the part worth sitting with if you inspect by monthly imagery instead of monthly site visits. A single frame tells you the state of the yard on the day the satellite went over, nothing about the four weeks before it. A pile against the fence could mean the yard has been chronically over capacity, or it could mean a single rail car got rerouted and the stock will be gone by Friday. Without a second or third data point, you can't tell the difference, and writing up a yard for a transient spike wastes everyone's time, including the yard's, if they've already got a buyer lined up for the material.
What the run of passes gave us instead was a shape. Flat, then creeping, then over. That shape is the thing to flag, not the single image where the fence line disappeared under scrap. It also changes the conversation when you call the operator.
"Your October and November counts both ran above what your permit allows for outdoor storage" lands differently than "we saw a pile once." One is a pattern they have to account for. The other, if it's isolated, they can usually explain in a sentence and move on.
None of this replaces walking the yard when something doesn't add up, a pile that's clearly ferrous stacked where the permit only allows non-ferrous storage isn't something you settle from a rooftop view. But for the routine question, this yard against this yard's permit, this month against last month, the monthly read does the job the drive-by inspection used to eat a morning on. We run that exact comparison, stored material against what the licence allows, on Recycling Facility Map, pulling a count and volume estimate from the same imagery every month so you're looking at a trend before you ever load the truck.
If you've got a yard you suspect has been creeping toward its limit for longer than one bad week, that's worth putting on the list.
