Blog
16 November 2026
Field notes: the yard that stacked to the fence line the week before our passA field note on a scrap yard that piled material against its perimeter fence right before a monthly pass, and what that timing actually tells an inspector.
16 November 2026
What is a maximum storage duration limit in a recycling permitWhat a storage duration limit in a recycling facility permit covers, how it differs from a volume cap, and how long material can legally sit.
9 November 2026
How to tell e-waste from scrap metal in satellite imageryWhat 0.5 m RGB imagery can and can't show about mixed waste streams, and what proves a yard is within its electronics recycling permit.
9 November 2026
What is a storage setback requirement in a recycling facility permit?Storage setbacks in a recycling facility permit set minimum distances from the property line. What they cover and why piles drift past them.
2 November 2026
Field notes: the permit renewal that lined up with the pile finally fittingA field-notes look at why permit renewals and stockpile volume keep colliding, and what a monthly read on stored material would have shown sooner.
2 November 2026
What is a permit modification trigger for stored material volume?What makes stored material volume cross from normal operation into a permit modification trigger, and how inspectors can catch it between site visits.
26 October 2026
How often should a permitted recycling facility be inspected?Permit inspection frequency depends on tier and compliance history. How to read your permit and set your own monitoring schedule between visits.
26 October 2026
Putrescible vs non-putrescible waste permits: where the conditions divergeHow permit conditions differ between putrescible and non-putrescible waste facilities, and what that split means for a compliance check.
19 October 2026
Field notes: the pile that grew past the permit between two site visitsA field-notes look at how permitted storage piles drift past the cap between inspection visits, and why that gap is where exceedances start.
19 October 2026
What is a waste tire pile storage limit in a solid waste permit?A plain explanation of tire pile storage limits in solid waste permits, how fire code shapes them, and how inspectors verify pile size against the permit.
14 October 2026
Tire pile vs scrap metal pile: how fire code storage limits differWhy NFPA 1 treats outdoor tire piles so much tighter than scrap metal stockpiles, and what that means for your next permit inspection.
14 October 2026
Permit-by-rule vs. full solid waste permit: what the difference means for inspectionA field guide to permit-by-rule recycling facilities versus full solid waste permits, and what each tier means for a compliance inspection.
13 October 2026
Ferrous vs non-ferrous scrap piles: how to tell them apart in satellite imageryWhat color, shape, and pile geometry tell you about ferrous vs non-ferrous scrap in overhead imagery, and where that read runs out.
13 October 2026
Estimating stockpile height from shadow length in satellite imageryHow to back out a scrap pile's height from its shadow in a satellite image, the sun-angle math behind it, and where the method falls apart.
7 October 2026
Baled scrap vs loose scrap: how to tell them apart in satellite imageryHow to tell baled scrap from loose pile scrap in satellite imagery, by shadow geometry, stack shape, and yard layout, before a site visit.
7 October 2026
How to find the storage capacity limit in a solid waste permitWhere the storage cap sits in a solid waste permit, what section it's filed under, and how tonnage limits differ from footprint limits.
7 October 2026
How to spot unpermitted storage expansion at a recycling facilityHow to catch unpermitted storage expansion at a recycling facility before it shows up at your next site visit, using monthly imagery against the licence plan.
7 October 2026
What counts as stored material under a solid waste permitA rundown of how solid waste permits define stored material, how categories differ by facility type, and what inspectors check against the licence.